Industrial Control Panel Assembly UL Approved

Our industrial control panel manufacturing process is now certified by UL to Standard 508A.  We can apply the UL certified mark to any panels we build that meet this standard.

INDUSTRIAL CONTROL PANEL MANUFACTURING

Here we see the President of Gedawin Novo Controls, Geoff Shewfelt applying the first UL mark to a panel that was assembled as per the certification process.

Gedawin Assists Health Care Workers with Supply of PPE

Gedawin Novo Controls is helping to fight COVID-19 by donating a control system to increase the supply of Personal Protective Equipment (PPE) to front line health care workers.

A client approached Gedawin with a design concept to allow them to manufacture medical face shields. The system heats up the face shield plastic using heating elements while mechanically pressing it into the desired shape. The client requested assistance from Gedawin to design and supply the heating system controller that would integrate with their mechanical system.

Gedawin welcomed the challenge and was able to respond quickly to design and build a system within days using existing inventory and other readily available parts. The controls allow for precision heat regulation to ensure high quality face shields. Gedawin was happy to donate the system to the cause and it was delivered to a grateful client for immediate use.

“We are fortunate that we continue to work during the COVID-19 crisis while many others cannot,” said Geoff Shewfelt, President of Gedawin Novo Controls. “If the donated equipment can help protect health care workers and contribute to a safe return to normal, we are happy to do it.”

Gedawin Novo Controls supplies control, protection, balance of plant systems as well as overall project management and technical support for the small hydro generation industry.

 

 

Gedawin & A Red Lion To The Rescue

Gedawin Novo Controls helped a client with a recently acquired generating station.  The problem was that their remote SCADA system couldn’t access the station controls remotely.  We configured and installed a Red Lion Modular Controller, to act as a data concentrator. The Red Lion unit will act as a master and poll the GE Fanuc 90-70 PLC in the plant to allow data from all four units at the station to be available to the remote SCADA system. The Red Lion database includes the control registers so the SCADA will be able to send control commands.

Always There With Helping Hands

                                             

When a local operator needed a second and third pair of hands, Gedawin Novo Controls was there.  We showed up dressed for the job and equipped to meet all the site’s health and safety requirements for the task.

We were there to help the operator remove flashboards on the weir.  The flashboards are used to keep the water level higher in the summer to generate more power.  With fall arriving, the flashboards were no longer needed.

This shows Gedawin’s ability to assist their clients with any and all challenges they may meet while operating their generating station.

Call Gedawin at 613-797-7173 for Hydropower Expertise

Greetings from Mary’s Harbour

Geoff Shewfelt of Gedawin Novo Controls took a moment to capture this selfie at a generating station in Mary’s Harbour, Labrador.

He’s there helping commission the station.  Having the station up and running, lessens this remote community’s reliance on diesel fuel for electricity.

Which I think we can all agree, is a very good thing.

 

Moose Rapids PFCC Work Is Completed

The dark and hazy look to this picture isn’t a filter that has been added.  What you see is a project being completed in a generating station during a complete station outage.  This was necessary in order to complete a PF correction capacitor circuit upgrade at TransAlta Renewables’ Moose Rapids site.

Kenora Recommissioning 2019

The staff of Gedawin Novo Controls have returned from H2O Power’s Kenora Generating Station.  Our purpose there was to re-commission the unit control systems to ensure that they worked with the new turbine/generator systems. H2O Power assembled a great group of companies whose people worked extremely hard to ensure that the work was completed at a very high level.

Great job everyone!

 

Appleton Head Gate & Other Work Project Done!

The Appleton Head Gate & Other Work project has been completed.  The last task was to move the newly fabricated head gate from G3 over to G2.  The G2 gains are better for storing the head gate.

We would like to thank Valley Sales & Equipment, Kanata Crane and Nortrax for helping us complete this project for TransAlta Renewables.